Brock team member, Doug Preston, was awarded with Brock’s Gold Coin for stepping up at a crucial moment during a major site outage commenced at Covanta in Burnaby, British Columbia. Without hesitation Doug rose to the occasion and provided crucial leadership at a key time. The client acknowledged Doug’s leadership for executing at a higher level with a lower cost than previous outages. Joe Brickner presented Doug with a Gold Coin for demonstrating Brock’s culture of caring by taking charge of the event.
top of page
Be A Part of the Solution. Together, we create solutions
FACILITY MAINTENANCE
FIREPROOFING
INSULATION
ELECTRICAL &
INSTRUMENTATION
ABATEMENT
LEAK DETECTION & REPAIR
MECHANICAL
METAL FABRICATION
PIPING
PROJECT CONTROLS
CIVIL
PROTECTIVE COATINGS & LININGS
REFRACTORY
STRUCTURAL
REMOVABLE INSULATION COVERS
PAINTING
SAFETY ATTENDANTS
SAFETY MANAGEMENT
SCAFFOLDING
SURFACE PREPARATION
ROPE ACCESS
FACILITY MAINTENANCE
FIREPROOFING
INSULATION
ELECTRICAL &
INSTRUMENTATION
ABATEMENT
LEAK DETECTION & REPAIR
MECHANICAL
METAL FABRICATION
PIPING
PROJECT CONTROLS
CIVIL
PROTECTIVE COATINGS & LININGS
REFRACTORY
STRUCTURAL
REMOVABLE INSULATION COVERS
PAINTING
SAFETY ATTENDANTS
SAFETY MANAGEMENT
SCAFFOLDING
SURFACE PREPARATION
ROPE ACCESS
bottom of page
Comments